Torches |
- Model ST2: 50,000 - 200,000 BTU
- Model ST3: 90,000 - 375,000BTU
- Comes with 10’of Certified hose & tank fitting
- Low operating pressure
- Non-slip steel handle
|
 |
|
Wheel Kits |
- Fits Sureflame model S405
- Easy assembly and attachment
|
 |
|
Hose |
- UL Approved hose
- 3/4” and 1-1/4” diameters for propane or natural gas
- 10’, 25’and 50’lengths
- Both ends are NPT male threaded and come with a female swivel adapter
|
 |
|
Thermostat Lock Box |
- UL Approved hose
- 3/4” and 1-1/4” diameters for propane or natural gas
- 10’, 25’and 50’lengths
- Both ends are NPT male threaded and come with a female swivel adapter
|
 |
|
Diffusers for Ducting |
- Used for tent heating
- Part# DIF12 forLVF90 and HVF180
- Part# DIF18 for HVF300
|
 |
|
Thermostat |
- Fits LVF90, HVF180 and HVF300
|
 |
|
Regulators |
- High pressure regulators for natural gas or propane
- First stage regulator reduces propane tank pressure to 3-30 PSI (HR1053)
- S405 regulator handles up to 60 PSI (40SV06)
- S1505 regulator handles up to 10 PSI (11SV08)
|
 |
|
Circulation Fuel Preheater |
- Ensures quick smooth “cold weather” start-up
- Standard on VF1000
- Optional on VF400
|
 |
|
Immersion Heater for Fuel Tanks |
- 120V (1000 watts)
- Keeps fuel at optimal flow rate and prevents fuel “gelling”
|
 |
|
Oil Fired Fuel Tanks |
- VF400 Tank (FT400)
- 75 gallon tank
- Single wall tank
- Forklift capability from all four sides
- Minimum 25 hour run time
- VF1000 Tank (FT1000)
- 340 gallon tank with fuel gauge
- Double wall tank
- Forklift capability from all four sides
- Minimum 47 hour run time
|
 |
|
Direct Fired Heaters | Make - Up Air | Indirect Fired Heaters | Electric Heaters
Ground Thawing | Fans & Blowers | Accessories & Optional
Equipment
About Us | Our Products | Online Quote | Locate A Dealer | Applications
Training & Education | Product Manuals | Part Breakdowns | News & Events | FAQ
Customer Resource Center | Online Inquiry | Contact Us | Home
|
|
|